Chappell TilingTiling · Panelling · Floors
Journal · 5 min read

Inside a luxury metallic epoxy floor

A walkthrough of how a decorative metallic epoxy floor is built — from diamond-grind to topcoat.

A premium metallic epoxy floor takes 4–6 days on site. It begins with mechanical diamond grinding of the existing concrete, moisture testing and crack repair — the substrate dictates the finished result more than the resin itself.

A pigmented primer is rolled, followed by the metallic build coat — pigments are hand-worked while wet to create the distinctive cloud and depth. Two coats of a clear polyurethane or polyaspartic topcoat lock the finish in: hard-wearing, chemical-resistant and easy to clean.

The result is a seamless, joint-free floor with the visual depth of polished stone and the durability of an industrial system — ideal for luxury garages, showrooms and hospitality spaces.

CallFree Quote